Dear Members and Students,

Between Wednesday, 10 September 2025 and Monday, 15 September 2025, asphalt resurfacing work will be carried out on the road of approximately 2.5 km between the Cafeteria Junction and the School of Foreign Languages (Preparatory School) traffic lights.

Within the scope of the work:

• The route including the bus stops of Civil Engineering, Environmental Engineering, Biological Sciences Department, and the Faculty of Architecture will be followed.

• The road will be closed to traffic in stages.

• Vehicles will be directed to alternative routes.

For traffic safety, it is of great importance that all drivers and pedestrians comply with warning signs and traffic signals. We thank you for your understanding and cooperation during the course of the works.

Kind regards,

Division of Construction and Maintenance


Last Updated:
09/09/2025 - 19:43